FYI: Science Policy News
FYI
/
Article

NASA Cancels Big-Budget Robotic Servicing Demonstration

MAR 05, 2024
The mission had already received $1.5 billion but faced continued cost, schedule, and technical challenges.
Will Thomas
Spencer R. Weart Director of Research in History, Policy, and Culture
The International Space Station pictured from the SpaceX Crew Dragon Endeavour on Nov. 8, 2021.

Illustration of OSAM-1, bottom, grappling Landsat 7.

(NASA)

NASA announced on March 1 that it is terminating its On-Orbit Servicing, Assembly and Manufacturing 1 (OSAM-1) mission, which was supposed to have refueled Landsat 7, demonstrating capabilities for robotically servicing satellites not designed to be serviced.

The mission, formerly called RESTORE-L, also incorporated a robotic arm called Space Infrastructure Dexterous Robot (SPIDER) that would have assembled a 3-meter communications antenna and a 10-meter beam. Congress has strongly supported OSAM-1, appropriating about $1.5 billion to date and often exceeding the amounts annually requested for it.

However, the project’s cost and schedule estimates have been unstable, with the price tag currently pegged at more than $2 billion. NASA states its termination decision is linked to “continued technical, cost, and schedule challenges, and a broader community evolution away from refueling unprepared spacecraft, which has led to a lack of a committed partner.”

Last year, NASA’s Office of Inspector General highlighted poor performance by the contractor Maxar as a key cause of the project’s ongoing difficulties.

NASA’s Goddard Space Flight Center in Maryland has been developing OSAM-1 and the agency states it is “reviewing how to mitigate the impact of the cancellation” on the center’s workforce.

This news brief originally appeared in FYI’s newsletter for the week of March 4.

Related Topics
More from FYI
FYI
/
Article
FYI
/
Article
Eyeing victory in November, Dems on the House Science Committee hope to reverse the ‘damage’ the Trump White House has caused to science while still pursuing bipartisan priorities.
FYI
/
Article
Approved grants face extra reviews and delays, and observers fear a behind-the-scenes installation of proposed political reviews.
FYI
/
Article
DOE’s smaller scientific advisory committee may not be equipped to plan the future of the physical sciences, scientists say.
FYI
/
Article
Radio telescopes are losing important data as the government and companies look to increase Earth-to-space communications.
/
Article
Applying strain to achiral solids containing subunits of opposite chirality can induce controllable handedness.
/
Article
An exceptionally long, thin cloud appears for a few hours each morning during Mars’s dusty season. Models of the atmosphere couldn’t explain how it develops—until now.
/
Article
Since 2008, more than 100 colleges and universities in the US have stopped offering an undergraduate physics major. What happened?
/
Article
A tiny levitating bead records the kicks delivered by impacts from individual gas atoms. Its jitters could become the basis for precision measurements—and searches for dark matter.
/
Article

Related Organizations